|
|
October 29, 2007
![]() The crane lifts an approximately 20,000 pound air handler from the bed of a semi truck onto the Bee Building roof. A second air handler, a boiler, and smaller pieces of equipment are also lifted and will be assembled to complete the air conditioning, heating, and humidity control systems located on the roof. » |
© 2008 Fresno Metropolitan Museum |


