|
|
May 25, 2007
Build from the bottom up and demo from the top down. The demolition crew breaks apart and removes the concrete slab and foundations of the administrative office building. The entire southern half of the Van Ness Ave. side of the block is open and ready for grading and leveling. » |
© 2008 Fresno Metropolitan Museum |

